What to Expect:
– Residents may hear a loud roaring sound, similar to an airplane engine, during the blowdown process.
– The blowdown is expected to last approximately 30 seconds and may occur twice during the maintenance activity.
– This is a normal and controlled procedure used to safely release natural gas from the pipeline so maintenance can be performed.
– Blowdowns are essential for the safe operation and maintenance of TC Energy’s pipeline system.
For questions or concerns, contact TC Energy:
1-866-372-1601 (Weekdays 7:30 a.m.–5 p.m. MST)
cdn_landowner_help@tcenergy.com
In case of emergency: 1-888-982-7222